Battery storage: independent advisory, not an equipment vendor.

Sizing, use cases, revenue mechanisms and integrator tenders — we help you choose and negotiate, never to sell.

BESS — Reid Gardner, Nevada

The battery storage market attracts as many integrators as dispatch-software vendors — each with a solution to sell. Our role: help you decide if, how and with whom to invest, without ever being party to the sale.

Primary reserve — FCRFrequency regulation,sub-second response1–50 MW · 15–30 minSecondary reserve — aFRRBalancing market,automatic activation1–50 MW · 15 min–1 hCapacity mechanismGrid-operator certification,peak hours1–100 MW · annual obligationPV + BESS couplingSolar capture,dispatchable capacity1–50 MW · 2–6 hPeak shavingTariff optimization,demand-charge reduction0.5–10 MWh · 1–4 hGrid resilienceService continuity,backup power0.1–5 MW · a few minutesGENERATION / TRANSMISSION GRIDINDUSTRIAL SITE

What we assess for you

C&I / Industrial

Behind-the-meter storage

Peak shaving, tariff optimization, resilience to outages — we quantify the potential before any tender.

  • Power / energy / C-rate sizing
  • Tariff and demand-charge analysis
  • Grid resilience study
Hybrid PV+BESS

Solar and storage coupling

Co-located storage turns an intermittent PV asset into dispatchable capacity — we assess the real capture uplift.

  • AC vs DC coupled architectures
  • Expected capture rate
  • Bankability of the coupling
Ancillary services

FCR, aFRR, capacity mechanism

Stacking several revenues on one asset requires arbitrating between them — we model the optimal mix.

  • Balancing-market pre-qualification
  • Stacked revenue arbitrage
  • Historical replay simulation
Tender

Integrator selection

Technical specifications, objective bid evaluation, contract negotiation — you stay in control, we guarantee neutrality.

  • Detailed technical specifications
  • Selection matrix
  • Selection criteria
  • Performance guarantee review

Our method

1DIAGNOSIS

Grid study & revenue potential

Connection diagnosis, revenue modeling by mechanism, pre-sizing.

2BUSINESS CASE

Costing and sensitivity

Historical replay, IRR/NPV calculation, comparison of financing scenarios.

3SELECTION

Specifications & tender

Drafting technical specs, integrator consultation, neutral bid evaluation.

4FOLLOW-UP

Contracting & commissioning

Warranty review, final negotiation, support through commissioning.

Frequently asked questions

Do you sell batteries or turnkey integrations?

No. We have no capital or commercial ties with any manufacturer, integrator or EPC. Our compensation is exclusively client fees.

What is the typical duration of a storage engagement?

3 to 8 months depending on scope — from a quick sizing audit to a full owner's-engineer mandate through commissioning.

Can you assess a project already proposed by an integrator?

Yes — this is a frequent request. We challenge the sizing, business case and contractual terms of a received proposal, fully independently.

Do you work on non-lithium-ion technologies (flow, iron-air)?

Yes, wherever relevant to the client's profile — we remain technology-agnostic.