Regulatory framework for electricity flexibility (Bolivia).

A power market tightly integrated around ENDE: what's open to industrial users, and what isn't.

The Ley de Electricidad No. 1604 (1994) separates generation, transmission and distribution, sets up licences and concessions and fixes prices based on marginal costs. It does not cover renewables, storage, distributed generation or retailing (LexLatin, September 2026). The 2010 and 2012 nationalizations put the sector back under state control. Reform is advancing through supreme decrees, pending the bill.

Solar support structure

Generation, self-generation and sale contracts

RegimeRemuneration / pricing mechanismThreshold / capRegulatory statusPoint of attention
Wholesale market, Ley No. 1604Prices based on marginal costs (CNDC dispatch)No retailer figure: bilateral energy contracting does not exist today (LexLatin)In forceNo structured bilateral PPA framework identified.
Distributed generation and self-producers · DS 4477 (2021), DS 5167 (2024), DS 5549 (2026)NewOn-site consumption, surplus injected into the distributor's grid, compensation by time slots (remote injection and withdrawal within the distributor's area)Nano ≤ 10 kW, micro ≤ 50 kW, mini ≤ 500 kW; above 500 kW and up to 6 MW ("medium scale", DS 5549): reserved for self-producersIn forceSelf-producer = regulated industrial, mass-transport or basic-service consumer producing from renewable sources for its exclusive use, registered with the AE (DS 5167). Authorization of 1 to 6 MW projects must be detailed by the AE: check whether that regulation has been published.
Draft Ley de Electricidad y Energías RenovablesDraftPublic auctions to set prices; opening of generation, transmission and distribution to private investment; independent regulator (ERE); legal recognition of storage, distributed generation and the retailer (LexLatin)To be defined, bill not adoptedDraft
delivered to the Ministry of the Presidency on 7 May 2026; still to go through UDAPE, CONAPE and the Legislative Assembly
Not adopted at the verification date (LexLatin, 25 September 2026).

System operator and storage

The CNDC (Comité Nacional de Despacho de Carga) coordinates least-cost dispatch. No demand-response mechanism or dedicated storage remuneration has been identified in the current framework.

MechanismNatureIn force?Key parameterLimit / point of attention
CNDC dispatchLeast-cost system coordinationYesMarginal cost. Installed capacity of about 3,500 MW for a peak demand close to 2,000 MW (LexLatin)No active role for demand identified, no capacity market identified.
Battery storage (BESS)—NoNo specific rule: energy laws and plans do not take battery storage into account (Climate Tracker Latam, May 2025, citing the Cámara Boliviana de Electricidad)Example cited: isolated microgrid of Cerro San Simón (806.4 kWh lithium-ion battery with 181 kWp of PV, inaugurated late 2022), off the interconnected grid. The 2026 bill would recognize storage at the legal level (LexLatin).
Demand response—Not identified—No scheme identified.

Simplified, educational overview, non-exhaustive and not constituting legal advice. Framework verified on 14 November 2026. The May 2026 bill is not adopted at that date, and several 2026 decrees were read through secondary sources. Status to be rechecked before any decision.