Home · Bolivia Regulations

Regulatory framework for electricity flexibility — Bolivia.

A power market tightly integrated around ENDE — what's open to industrial users, and what isn't.

Electricity Law No. 1604 (1994) originally organized a liberalized market, but the 2010-2012 nationalizations recentered the sector around ENDE Corporación. It has never been repealed but provides for neither energy storage nor distributed generation — hence the replacement bill now under review.

Generation, self-generation and sale contracts

RegimeRemuneration / pricing mechanismThreshold / capRegulatory statusPoint of attention
Wholesale market (MEM)Marginal-cost tariffs set administratively by the AEMarket roughly 85% controlled by ENDE CorporaciónIn force — Law No. 1604 (1994)No open spot market and no structured corporate PPA framework comparable to Spain or France
Industrial self-generationResidual legal access to transmission/distribution networks (the "autoproductor" category)Not quantified in the reviewed textsLegal basis not repealed — actual use undocumentedA long-standing provision of Law 1604 whose effective use by private industrial users could not be confirmed
New PPA framework / private marketersDraftPublic auctions envisaged for new renewable generationTo be defined — bill not adoptedDraft — Electricity and Renewable Energy Law, filed on May 8, 2026Not adopted as of publication; at the current regulated market price, trade press reports that a private renewable project remains economically hard to justify

System operator and storage

CNDC (Comité Nacional de Despacho de Carga) coordinates least-cost dispatch. No curtailment mechanism or dedicated storage remuneration was identified in the current framework.

MechanismNatureIn force?Key parameterLimit / point of attention
CNDC dispatchLeast-cost system coordinationYesMarginal cost, in a context of installed overcapacity (~3,500 MW for ~1,600-1,900 MW of demand)No active demand-side role, no capacity market identified
Battery storage (BESS)NoNo specific standard identified (Cámara Boliviana de Electricidad, 2026)Only one notable project on record: the isolated Cerro San Simón micro-network (806 kWh, off the SIN) — no relevance for grid-connected industrial use
Curtailment / demand responseNot identifiedNo mechanism identified; also absent from the stated priorities of the 2026 bill

Simplified view, for educational purposes, non-exhaustive and not constituting legal advice. Bolivia's market remains structurally closed as of publication; the May 2026 bill (storage, private marketers, an independent ERE regulator) has not yet been adopted — status to be re-verified before any decision.