Regulatory framework for electricity flexibility (Peru).

Distributed generation, battery storage status and the corporate PPA framework. The state of the law and its grey areas.

We have not identified a paid demand-response scheme comparable to the French NEBEF; this point is to be rechecked. The tables below distinguish the regimes in force from texts that are still drafts.

Solar installation on the shore of Lake Titicaca

Generation, self-generation and sale contracts

RegimeRemuneration / pricing mechanismThreshold / capRegulatory statusPoint of attention
Bilateral contract, free user (usuario libre)Price freely negotiated between the partiesAnnual maximum demand > 2,500 kW: free user; between 200 kW and 2,500 kW: option to move to the free market; ≤ 200 kW: regulated user (Ley 28832, DS 022-2009-EM)In forceRelevant route for a corporate PPA outside the public scheme.
RER auctions (Decreto Legislativo No. 1002)Tariff awarded at auction; RER premium paid under the compensation scheme (funded by users)RER sources: biomass, wind, solar, geothermal, tidal; hydro only if installed capacity is ≤ 20 MW (art. 3 of DL 1002)In force
four RER auctions (first to fourth) and one off-grid auction run by OSINERGMIN
Public scheme, distinct from a bilateral corporate PPA.
Distributed generation (self-consumption with surplus injection)DraftPer the draft: surplus sold on the short-term market, through a supply contract, or via injection compensationMaximum power: the lower of the contracted power and 10 kW (single-phase low voltage) or 200 kW (other three-phase LV and MV connections)Draft
Ministerial Resolution No. 439-2024-MINEM/DM, published 25 November 2024; no final approval found at the verification date
Status to be rechecked with MINEM before any decision.

Wholesale market and ancillary services

COES coordinates the operation of the interconnected system (SEIN). Ley No. 32249 (published 19 January 2025) amends Ley 28832 and adds a chapter on ancillary services, applicable from 1 January 2026. Its implementing regulation is still a draft; it is meant to open this market to storage (trade press).

MechanismNatureIn force?Key parameterLimit / point of attention
Spot market (COES)Centralized dispatch by COESYesSystem marginal costNo active role for demand identified in the texts consulted.
Ancillary services (Ley No. 32249)DraftPotential external revenue for storageNo
regulation under consultation
Implementing regulation: draft supreme decree published by RM No. 171-2026-MINEM/DM (19 April 2026), comment period extended by RM No. 209-2026-MINEM/DM (12 May 2026)No final version found at the verification date. Not to be presented as an operational scheme.
Demand response—Not identified—No dedicated scheme identified to date; to be reassessed periodically.

Simplified, educational overview, non-exhaustive and not constituting legal advice. Several schemes cited (distributed generation, ancillary services) are still draft regulations. Framework verified on 14 November 2026; status to be rechecked before any investment decision.